Los Laureles, 4.8 MW

LAURELES hydroelectric plant

This hydroelectric project has a gross head of 78m and uses water from the San Juan river. It consists of a concrete dam with overflow spillway, lateral intake and desander structure. The water is conducted through a low pressure steel pipe, followed by a 640 m long headrace tunnel to a pressure chamber serving as intake site for the pressure pipeline. The powerhouse has 2 horizontal-shaft Francis turbines.

Tunnel in metamorphic rocks with a diameter of 3.45 m

CARBON Engineering was hired by Genera S.A. de C.V. for the feasibility study, final design , construction plans of civil works and technical inspection of the project.

Project Information

Type: hydroelectric
Status: In operation since January 2014

Metrics

Installed capacity: 4.8 MW

Client

Client: Genera S.A. de C.V.
Location: Departament of Atlántida, Honduras

  • Address

    Oficentro Alquimia, 100 mts south from John Deere’s dealership
    La Uruca, San José, Costa Rica.
    Tel: (506) 2290 4070 | Fax: (506) 2290 7122
    This email address is being protected from spambots. You need JavaScript enabled to view it.