Guanacaste, 50 MW

GUANACASTE Wind Power Plant

This wind farm was developed under a BOT scheme, promoted by the Instituto Costarricense de Electricidad (ICE) and developed by Consorcio Eólico JES. It consists of 55 ENERCON wind towers, with height of 45 m. interconnected by an underground collection manifold system to a control building and substation.

First BOT wind power project promoted by the Instituto Costarricense de Electricidad (ICE)

CARBON Engineering was hired by Consorcio Eólico JES to develop the bidding document for the BoP contractor, the final design and construction plans for BoP.

Project Information

Type: wind power
Status: In operation since December 2009

Metrics

Installed capacity: 50 MW

Client

Client: Consorcio Eólico JES.
Location: Bagaces, Guanacaste

  • Address

    Oficentro Alquimia, 100 mts south from John Deere’s dealership
    La Uruca, San José, Costa Rica.
    Tel: (506) 2290 4070 | Fax: (506) 2290 7122
    This email address is being protected from spambots. You need JavaScript enabled to view it.